
How to apply
Closing date: 18 September 2026 · 1 day left
Job summary
- Reference
- 1
- No. of vacancies
- 1
- Published
- 17 September 2026
- Closing date
- 18 September 2026
- Country
- Afghanistan
- Province
- Kabul
- Functional area
- Technology › Information Technology, Engineering & Construction › Engineering, Development & Humanitarian › Monitoring & Evaluation
- Education
- Bachelor's degree
- Experience level
- Senior level
- Years of experience
- 8 years
- Employment type
- Full time
- Contract type
- Fixed term
- Probation period
- One month
- Gender
- Male
- Languages
- Dari, English, Pashto
- Salary
- As per company salary scale
About the job
TVC United Company is implementing a 34 MWp grid-connected solar PV IPP with a 10 MWh Battery Energy Storage System (BESS) at Green Industrial Park, Dehsabz, Kabul. The project has reached financial close and is entering the construction phase.
The Project Manager will lead owner-side delivery during construction, grid connection, BESS integration, commissioning, performance testing, and handover. The role is responsible for ensuring safe, timely, cost-controlled, and contract-compliant project execution.
Duties & responsibilities
2. Main Responsibilities
Project leadership and governance
Serve as company focal point for EPC construction, grid interface, commissioning, and handover.
Establish project governance, meetings, reporting templates, action trackers, decision logs, and escalation routes.
Coordinate EPC Contractor, Owner's Engineer, DABS, suppliers, authorities, lenders, and internal management.
Contract, schedule, and cost control
Administer EPC contract obligations, notices, variations, claims, payment milestones, warranties, guarantees, and contractual correspondence.
Monitor baseline schedule, critical path, procurement, logistics, construction progress, budget, cash flow, and recovery actions.
Prepare concise dashboards and management reports covering progress, cost, risk, claims, decisions required, and next critical milestones.
Technical, BESS, quality, and HSE coordination
Coordinate review of drawings, method statements, technical submittals, protection studies, SCADA/EMS/BMS architecture, and interface documents.
Track PV, inverter, transformer, MV/HV switchgear, cable, SCADA, substation, grid connection, and BESS interfaces from design through commissioning.
Ensure the EPC Contractor implements approved HSE, environmental/social, quality, inspection, testing, and documentation procedures.
Escalate unsafe works, major non-conformities, delay risks, equipment issues, and stakeholder constraints for timely resolution.
Grid connection, commissioning, and handover
Coordinate DABS interface, grid code compliance, protection/metering/SCADA requirements, permits, substation readiness, and energization approvals.
Oversee commissioning readiness, pre-commissioning, energization, synchronization, PV performance testing, BESS functional/capacity testing, and punch-list closure.
Ensure as-built drawings, O&M manuals, warranties, training records, spare parts, test certificates, and completion documents are ready for handover.
3. Deliverables
No.
Deliverable
Core Content
Timing
Project execution and mobilization plan
Governance, schedule, interface matrix, reporting, HSE/QA overview, and commissioning strategy.
As required
Weekly and monthly progress reports
Physical progress, schedule/budget status, risks, decisions required, HSE, quality, and photos.
As required
Risk, issue, decision, and contract registers
Variations, claims, notices, payment milestones, constraints, and mitigation actions.
As required
Procurement and logistics tracker
PV, BESS, inverter, transformer, switchgear, cable, SCADA, spares, FAT/SAT, shipping, and site delivery status.
As required
Grid connection and commissioning readiness reports
DABS interface, energization prerequisites, testing status, BESS functional/capacity tests, and punch list.
As required
Handover and close-out support dossier
As-built drawings, O&M manuals, warranties, training records, spare parts, certificates, and lessons learned.
As required
4. Reporting and Coordination
The Project Manager reports to the CEO / Project Director / Steering Committee and provides immediate escalation on major HSE events, schedule delays, commercial claims, budget deviations, grid issues, or risks to commercial operation.
Key coordination interfaces include the EPC Contractor, Owner's Engineer or Lenders' Technical Advisor, DABS, government authorities, BESS supplier/integrator, lenders, insurers, finance/legal/procurement teams, and O&M team.
5. Duration and Duty Station
The assignment will start from construction mobilization and continue through commissioning, performance testing, commercial operation readiness, handover, and close-out support. The expected duration is typically 12-18 months, subject to the approved project schedule.
The duty station is primarily site-based at Green Industrial Park, Dehsabz, Kabul, with Kabul office presence as required for reporting, contract administration, and stakeholder coordination.
Job requirements
6. Qualification Requirements
Bachelor's degree in Electrical, Power, Civil, Mechanical, Renewable Energy, Project Management, or related discipline.
Minimum 10 years of experience in power, infrastructure, renewable energy, EPC, or construction project management.
Minimum 5 years managing utility-scale power projects; solar PV experience of at least 10 MW is strongly preferred.
Experience with BESS, substations, MV/HV systems, grid interconnection, SCADA, commissioning, and EPC contract administration is highly desirable.
Familiar with project management software, Primavera P6, Ms Project or equivalent is an advantage.
7. Key Competencies
Leadership, contractor management, negotiation, decision-making, stakeholder coordination, and disciplined follow-up.
Strong understanding of project controls, risk management, critical path, cost control, claims, documentation, and contract notices.
Ability to interpret engineering drawings, schedules, technical reports, commissioning procedures, quality records, and contract requirements.
Strong written and spoken communication skills for executive reports, dashboards, minutes, letters, and decision papers.
8. Performance Criteria
Area
Criteria
Schedule and budget
Milestones, cash flow, variations, claims, and recovery plans controlled against approved baseline.
Quality and HSE
Works comply with approved design, EPC contract, standards, QA/QC plan, and HSE requirements; zero major HSE incidents.
Stakeholder coordination
Timely coordination with EPC, Owner's Engineer, DABS, authorities, lenders, suppliers, and management.
Commissioning and handover
Successful energization, synchronization, PV performance test, BESS functional/capacity testing, and complete handover dossier.
9. Languages and Application Procedure
Fluency in English, written and spoken, is required. Knowledge of Dari and/or Pashto is required for site and authority coordination.
Interested candidates should submit an updated CV and cover letter explaining suitability for the position.
Applications should be submitted to Info@tvcunited.com with the subject line: "Project Manager - 34 MWp Solar PV.
Submission guideline
· Applications should be submitted to Info@tvcunited.com with the subject line: "Project Manager - 34 MWp Solar PV.
